SYNCRAFT®Werk / Dornbirn / AT

SYNCRAFT®Werk SCW700 / Dornbirn / Austria

SYNCRAFT®Werk Dornbirn was built in 2014 with a construction period of only 3 months and was successfully connected to the grid by the end of 2014.

The plant of type Craftwerk 700 has a thermal capacity of 650kW and produces 180kW electrical and more than 350kW thermal power.  SYNCRAFT®Werk Dornbirn makes use of commercially available, dried wood chips (G30 / G50), including barks and fines. The power generation of the product gas takes place in an agenitor 406 gas engine of 2G with an electrical efficiency of 40%.